typescript - J.H. Hutton's tour diary in the Naga Hills | |
| caption: | Inadequate bridge over Chulin River |
| medium: | tours |
| keywords: | bridges |
| location: | Mechangbung Chulin R. Leike (Leikei) |
| date: | 2.9.1922-3.9.1922 |
| text: | 2nd Sept |
| text: | To Mechangbung. |
| text: | The Chulin river has been bridged 3 times this rains and washed away each time. The present bridge put up yesterday for my benefit will only last till the river rises again. There is a single wire rope and I propose to try and put it across again and sling a cradle on it which would make it always possible to get across. |
| text: | 3rd Sept |
| text: | To Leikei. |
| refnext: | Next |
| refprev: | Previous |