manuscript - Christoph von Furer-Haimendorf, Naga diary four | |
caption: | rebuilding the house of Thepong morung Ang |
caption: | roofing |
medium: | diaries |
ethnicgroup: | Konyak |
location: | Wakching |
date: | 24.3.1937 |
text: | By about twelve o'clock the ridge beam is tied up and now immediately the building of the roof frame is continued. Bamboo or strong poles are placed onto the house wall and on the ridge beam so that they form a gable and these poles are connected with horizontal bamboos in the interior |
refnext: | Next |
refprev: | Previous |